Renewable energy store home page: buy solar panels, wind turbines, batteries and regulators
   
Energy Mattershome
Energy Mattersinformationsolar power
Energy Mattersproductssolar power
Energy Mattersloginsolar power
Energy Matterscontactsolar power

We only stock proven brands. Order online or call 1300 727 151

All products ready for immediate delivery world-wide.

renewable energy equipment
renewable energy equipment renewable energy equipment
renewable energy equipment
Energy Matters accepted cards
renewable energy equipment
energy matters

Renewable Remote Power Generation Programme (RRPGP)

National RRPGP 50% Rebate effective NOW!

For stand alone systems far from the existing grid you may be eligible for the new $123.5M RRPGP program effective from 23 July 2007.

The program streams are as follows:

  1. Rebates of maximum $200K for Stand Alone Power Systems
  2. The Major Project (rebate greater than $200,000) and Industry Support - guidelines and application forms will be available shortly.

Eligibility for rebates of maximum $200K for Stand Alone Power Systems include the following criteria:

  • System is installed at principal place of residence or for systems serving communities the applicant must be the governing authority of the community or an appropriately authorised representative; and the system must primarily supply facilities that are a key part of the community.

  • Connection of grid must exceed a distance of 1 kilometre from the nearest main-grid line or provide evidence from the local network service provider that the total cost to connect to the main-grid is more than $30,000. Applicants just short of the $30,000 main-grid estimated connection cost threshold may be eligible. To be considered, applicants must attach a one page letter of explanation with the Pre-purchase application and guarantee to repay the rebate if the site is connected to the main-grid within five years following installation of the renewable generation system.

  • Equipment on which a rebate is sought must be new and must be purchased after a Pre-purchase application has been approved by the administrator.

  • Expenditure on renewable generation equipment (panels, inverters, regulators etc - defined in the Rebates available section of the official AGO RRPGP guidelines) must be at least 30 per cent of the total cost of equipment and services on which a rebate is sought.

  • The minimum size of the renewable generation component of the system is 450 W peak output.

  • The system must be designed by a person holding design accreditation from the Business Council for Sustainable Energy or by an appropriately experienced member of the Institute of Engineers Australia.

Please download the Residential and Medium-scale RRPGP Guidelines for more information.

How to apply

For more information please contact the Remote Power Infoline on 1300 137 880, go to the AGO website, or contact Energy Matters.